Variation Order: Proof of What Changed
The form is easy. Showing the floor before and after the change is the part that gets disputed.
Put a date on the variation before the argument about money starts. Book a 30-minute demo on one live site. Use it free for 30 days.
30 days free when you book a demo, or 14 days free with no credit card.
A variation order is how a contract changes. The fight is rarely about the form. It is about what the site looked like before the change, and what it looks like now. Phone photos from different corners do not settle that.
Change order construction
Change order construction is the US name for the same evidence as a variation order: two dated views of one spot. UK, Malaysia, Singapore, and Hong Kong contracts usually say variation order. SpatialSense holds those two walks. A person still writes the variation and sends it.
Interim payment, progress claim, and IPC
Progress claim construction is the dated walk attached to that period’s payment. An interim payment application or an IPC asks to be paid for work done. In Saudi Arabia teams often call that application a mustakhlas (مستخلص). SpatialSense does not raise the certificate and it does not approve the percent. It holds the dated walk you attach, so the claim shows the floor, not a folder of loose photos.
Attach the same walks to the construction progress report for that week. The report is the pack. The variation is the change. They should point at the same dates.
Two walks are the backup
Walk before the varied work, and walk after it. Open both dates on the same viewpoint. Measure on the point cloud if the quantity is in dispute. A person still writes the variation and sends it. The walk is the evidence underneath.
What this is not
- Not a payments module. It does not certify a valuation.
- Not an automatic percent complete.
- Not a punch list. Incomplete contract work stays on the punch list or the snagging list.
Frequently asked questions
What is a variation order?
A variation order is a change to the contracted work. It records what changed, why, and the effect on time or money. In the US the same document is often called a change order.
What evidence should sit behind a variation?
The condition before the change and the condition after it, on the same spot, with dates. A 360° walk on each date is that record. SpatialSense does not price the variation or certify the payment.
What is an interim payment or a progress claim?
An interim payment, progress claim, or IPC is the application to be paid for work done in that period. In Saudi Arabia the same application is often called a mustakhlas. The walks are backup for what you are claiming. They are not the certificate.
Is a variation the same as a punch item?
No. A punch or snag is work already in the contract that is unfinished or defective. A variation is a change to the contract. Keep them in separate records.
Book a demo and attach one live variation to a dated walk. Book a 30-minute demo on one live site. Use it free for 30 days.