Construction Quality Assurance: A Practical Guide

Quality problems are cheapest to fix before they're covered up. Construction quality assurance is the system that makes sure someone looks in time.

Construction quality assurance (QA) is the planned system of processes, responsibilities and records that makes sure work is built to the contract drawings and specifications. It is preventive: it sets how work will be checked before the work starts. Quality control (QC) is the inspection and testing that happens as the work is done.

QA vs QC: the difference

Quality assurance (QA)Quality control (QC)
FocusThe processThe product
TimingBefore and throughout the workDuring and after each activity
GoalPrevent defectsFind and fix defects
ExamplesQuality plan, procedures, submittal review, training, auditsInspections, material tests, surveys, checklists signed at hold points
Typical ownerQuality manager, project managementSite engineers, inspectors, testing labs

In practice the two are run together as one quality management system. Many contractors base theirs on ISO 9001, and many contracts require a project-specific quality plan.

What goes in a construction QA plan

How to set up QA on a project, step by step

  1. Read the specification for quality requirements. List every test, inspection, tolerance and submittal the contract asks for.
  2. Break the work into packages and write an ITP for each: concrete, steel, waterproofing, MEP rough-in, façade and so on.
  3. Mark hold points before cover-up. Reinforcement before the pour, waterproofing before backfill, services before ceilings close, insulation before boarding.
  4. Agree acceptance criteria. Tolerances should be numbers from the specification, not "looks fine".
  5. Build first-work mock-ups and get them approved as the standard.
  6. Inspect and record as you go. Each record should say what was checked, where, when, by whom and the result, with photos.
  7. Raise and close NCRs. Track each to a disposition and a verified fix.
  8. Review trends. If the same defect keeps appearing, fix the process, not just the item.

Construction QA checklist

Common quality assurance mistakes

Where SpatialSense fits

SpatialSense supports the record and verification side of QA. It doesn't replace your quality plan or ITPs, but it makes the evidence behind them easier to capture and harder to argue with.

Verify as-built against BIM

Put the scan and the model in the same view and see where they disagree. Scan-to-BIM verification →

Measure in the browser

Check a dimension against a tolerance directly in the viewer. Measure point clouds →

Pin non-conformances

Raise the issue at its location with an owner and a status. Annotate and assign issues →

Capture before cover-up

Timestamped 360° walks of every area, captured with Trace. 360° site documentation →

Frequently asked questions

What is quality assurance in construction?

Quality assurance is the planned system of processes, responsibilities and records that makes sure construction work meets the drawings and specifications. It is preventive and is usually documented in a project quality plan.

What is the difference between QA and QC in construction?

QA is about the process: planning how quality will be achieved and checked. QC is about the product: the inspections and tests that confirm a specific piece of work meets the requirements. QA prevents defects; QC finds them.

What is an inspection and test plan (ITP)?

An ITP lists, for one work package, each inspection or test, when it happens, who does it, the acceptance criteria, whether it is a hold or witness point, and what record is kept.

What is a hold point?

A hold point is a stage where work must stop until a specified inspection is done and signed off, usually because the next activity will cover the work up, such as pouring concrete over reinforcement.

What is an NCR in construction?

A non-conformance report records work or material that doesn't meet requirements. It is reviewed, given a disposition such as rework, repair, accept as is or reject, and closed once the fix is verified.

How does reality capture help construction QA?

Scans and 360° walks give a dated, located record of the work, including work that will later be hidden. Overlaying a scan on the design model shows geometric deviations that are hard to see in photos.