How to Monitor Every Saudi Site From One Office (Without the Drive Across Riyadh)

A graded earthworks platform below a long cut slope, under a partly cloudy sky
Portfolio · week of 1 Nov 2026Sample
Every package walkedFixed days
Each beside last weekSame viewpoint
Two issues pinnedOwner + due
Review packPDF

It's Thursday afternoon and the portfolio review is on Sunday. Five contractors have sent five reports, each with its own percentage and photos you can't place on the plan, and the package you're uneasy about says it is on track. Checking means a day lost to the drive across Riyadh, so you leave it a week, and by the time the slip shows in the numbers it is a month old and your name is on the update to the client. On a programme tied to Expo 2030 or the 2034 World Cup, you can see that slip in the week it starts only if every site sends you the same kind of dated evidence on the same day.

Construction progress monitoring in Saudi Arabia works for an owner with several sites when every site is walked on a fixed day each week and each walk is dated on the plan, so your team can compare it with last week's from the same viewpoint. One office then holds a record it can check for itself.

Why is delivery pressure rising on Saudi projects?

Expo 2030 Riyadh will run from 1 October 2030 to 31 March 2031, and in July MEED reported that major construction on the site is targeted for completion by the end of 2029, leaving six to nine months for finishing and testing. The same report expects 50,000 to 70,000 workers at peak, with packages for the remaining signature pavilions coming to market later in 2026 and into 2027.

The World Cup programme is running alongside it. On 26 October, MEED reported that the Sports Ministry had tendered early works at King Salman International Stadium in Riyadh, the planned venue for the 2034 final, with bids due on 19 November and completion targeted for 2029. For an owner's team, that means more contractors working at once against dates that can't move, so the weekly question is which site needs you, and one office can only answer it if every site sends something comparable.

Which monitoring methods answer an owner's questions?

Search for construction progress monitoring in Saudi Arabia and you mostly find drone filming, time-lapse cameras and third-party monitoring services. Each method answers some of an owner's questions and leaves others open.

MethodWhat it shows an owner wellWhat it leaves you unsure ofBest used for
Contractor's weekly report with photosThe contractor's own account and percentagesWhere each photo was taken, and whether it matches last week'sThe record the contractor signs
Visits by your own teamEverything on that site, on that dayThe sites you didn't visit that weekHandovers, mock-ups and tests
Drone flightsEarthworks, roofs and the shape of a large siteInteriors, and anything under a slabOpen sites and early stages
Fixed time-lapse camerasOne view, all the timeEverything outside that viewA single façade or key structure
Laser scansMeasured geometryWeekly change, unless you scan weeklyMeasured checks before work is covered
Dated 360° walksThe whole route through a building on a known date, on the planPrecise measurementsWeekly comparison inside many buildings

Most portfolios need a mix, with drones over earthworks and scans where you need measured checks, but an owner's team also needs something comparable inside every building every week, and that is the job dated walks do well.

One package's weekly walk, opened in the owner's office: every package sends the same kind of dated record on the same day. Sample project.

What should every site send you each week?

  1. A fixed route and a fixed day, walked by a named person, so this week's walk can be laid against last week's.
  2. A date and a position on the plan for every capture, so nobody in your office guesses where a photo was taken.
  3. The same spot on two dates side by side, which your team looks at before it reads anyone's percentage.
  4. Issues pinned to the spot with an owner and a due date, so the next walk shows whether they were closed.
  5. A short progress report written from the two walks for your client pack.

Once every site sends that, the Sunday review starts from the sites where something changed, and a drive across Riyadh becomes a visit a walk asked for. Construction progress tracking with evidence covers the method in more depth.

One week, five packagesSample
  1. Sun 1 NovPackages 1 and 2Fixed route, walked by each site engineer2 dated walks
  2. Mon 2 NovPackages 3 and 4Same route and day as last week2 dated walks
  3. Tue 3 NovPackage 5Basement to roof, on the plan1 dated walk
  4. Wed 4 NovOffice comparesEach walk beside last week's, with two issues pinned to an owner
  5. Sun 8 NovPortfolio reviewStarts from what changed, with a PDF report per package
A weekly rhythm in which every package is walked on its own fixed day, so the Sunday review starts from what changed. Sample project.

What is specific to Saudi Arabia?

Settle data hosting before anyone uploads a walk. Government entities, their affiliates and operators of critical infrastructure follow the National Cybersecurity Authority's Essential Cybersecurity Controls, and the 2018 version included a control that an entity's information be hosted and stored inside the Kingdom, according to a 2019 legal summary. Personal data is a separate question, because the Personal Data Protection Law restricts transfers abroad and asks for safeguards such as standard contractual clauses, with a risk assessment in some cases, as a March 2025 legal update explains. A 360° walk usually shows people on site, so ask your client's IT and legal teams which rules apply, and ask every vendor where the data would sit.

Programmes here are also split into many packages. MEED describes the Expo site as five districts, each with a signature pavilion, and its 2024 count put eight of the planned new World Cup stadiums in Riyadh, so an owner's team needs every package under the same dates in one place. If your managers or your client's team prefer to work in Arabic, check which languages each tool's interface and alerts use before you roll it out.

Where SpatialSense fits

SpatialSense keeps 360° walks, drone flights and laser scans in one project, on every plan, so every site lives in the same platform whichever way its contractor captures it. Walks are captured with the Trace app and a 360° camera on a helmet or a car, any two dates open side by side from one locked viewpoint, and from two dated walks SpatialSense writes a station-by-station progress report tied to the images, as a PDF. On a thirty-week new build in Islamabad, the client's chief architect signs off progress weekly from Europe on that kind of record, as we describe in weekly sign-off without a site visit.

Issues are pinned to the spot with an owner and a due date and answered from the Konnect app, and share links open without a login and can be revoked. Every plan has unlimited users, so each contractor's team can be added without counting seats, and support is one to one with a person at Kodifly, around the clock.

Two limits are worth weighing. There is no published two-way sync with scheduling or project-management platforms, so your programme stays where it lives now. Ask us where your project's data would be hosted before the first upload, so your client's IT team can check the answer, and if a site only needs a monthly flight over earthworks, a drone survey on its own may be enough there.

Capture. Understand. Take Action.

See SpatialSense on your project

Pick the site you're least sure about and run a 30-day free trial of the full platform on it, with no card. Upload 360° panoramas of the same route a week apart in the browser (Trace is set up when you book a demo), open them side by side and send the link to the colleague who would otherwise drive out to check.

FAQ

Does construction data have to be hosted in Saudi Arabia?

It depends on who owns the project and what the data contains, because government entities follow the National Cybersecurity Authority's controls and personal data sent abroad falls under the Personal Data Protection Law. Ask your client's IT and legal teams before you choose a platform.

Do I need a BIM model to monitor progress?

No. A progress report can come from two dated walks without a BIM model, which suits owner's teams who don't hold the contractor's model. If you do have one, SpatialSense can show BIM models and overlays alongside the walks.